PROJECTS FOR REAL TIME MONITORING

[<<] [<] [1] [2] [3] [>] [>>]
Page:

CRSC (Setapak) Sdn Bhd / Lim Hoo Seng Construction Sdn Bhd
Installation and Monitoring of 4 nos EL Tiltmeters with datalogger for "Cadangan Pembangunan 1 Blok Pangsapuri Kos Sederhana 15 Tingkat (112 Unit) termasuk Tempat Letak Kereta dan Kemudahan Penduduk di atas Lot 1997, Mukim Setapak dalam bandaraya Kuala Lumpur"
Bumi Hiway (M) Sdn Bhd
Installation and Monitoring of 44 nos VW Spot-Weldable Strain Gauges, 3 nos VW Total Pressure Cells, 5 nos VW Earth Pressure Cells using dataloggers for Gebeng By-Pass Project, Kuantan, Pahang Darul Makmur - Instrumentation Works in Piled Embankment Slab at Bridge Approach
Bumi Hiway (M) Sdn Bhd
Installation of 30 nos VW Surface-Mount Strain Gauges and data acquisition system with alarms for Middle Ring Road 2, Package 11
MTD Construction Sdn Bhd
Installation and Monitoring of 6 nos EL Sled Sensors, 8 nos VW Embedment Strain Gauges, 4 nos Soil Misture Blocks and 1 no Tipping Bucket Rain Gauge using dataloggers for "Kerja-kerja Pembaikan Cerun Runtuh dan Ubin Jalan (Pavement) Jalan Gap - Bukit Fraser 9FT 148) Raub, Pahang"
MRCB Engineering Sdn Bhd
Vibration Monitoring, Installation and Monitoring of 6 nos Building/Surface Settlement Markers, 6 nos Inclinometers, 1 no Standpipe Piezometer and 4 nos EL Tiltmeters with dataloggers for Proposed One Block of 29-Storey Office at Lot 79, (PT 24/Lot N), KL Sentral
Latimer Corporation Sdn Bhd
Installation and Monitoring of 48 nos VW Surface-Mount Strain Gauges and 1 no Wind Speed and Direction Monitor with dataloggers for "Membina Jambatan Baru Kuala Kurau, Daerah Kerian, Perak Darul Ridzuan"
KI Geotechnics Sdn Bhd
Installation and Monitoring of 4 nos Magnetic Extensometers, 2 nos Inclinometers, 8 nos VW Total Pressure Cells, 16 nos VW Piezometers, 2 nos Rod Extensometers, 4 nos Horizontal Inclinometers with dataloggers, Supply 154 nos Resistance Wire Strain Gauges and 32 nos Settlement Plates including extension rods for “Projek Membina Jalan Pintas Gebeng, Kuantan, Pahang Darul Makmur - Geopier Research and Development Program”
Shahteguh Sdn Bhd
Vibration Monitoring, Installation and Monitoring of 2 nos EL Tiltmeters and 2 nos Building Settlement Markers with dataloggers for "Cadangan Mempertingkatkan Sistem Perparitan Induk berhampiran Flat Sri Perlis di Kawasan Kg Datuk Keramat Kuala Lumpur"
Indah Water Konsortium Sdn Bhd
Vibration Monitoring, Installation and Monitoring of 2 nos EL Tiltmeters and 2 nos Building Settlement Markers with dataloggers for Remedial Works for Damaged Sewer Pipe Line near LRT Universiti Station
Perunding Inovasi
Vibration Monitoring, Installation and Monitoring of 6 nos EL Tiltmeters and 8 nos Settlement Markers on piers/walls with dataloggers for the LRT System near Pudu Station during the Widening and Associated Works for a Monsoon Drain

[<<] [<] [1] [2] [3] [>] [>>]
Page: